Datacenter Colocation in Paris
Tier III rack space in Paris. 2N power, carrier-neutral connectivity, direct France-IX peering. Quarter rack to private cage.
Get a quote
Answer within one business day.
TL;DR
Tier III+ colocation datacenter in Paris with 2N power, carrier-neutral connectivity and direct France-IX peering.
- Certification
- Tier III+
- Uptime SLA
- 99.99%
- Carriers
- 50+
- Peering
- France-IX
Technical Specifications
| Tier | Tier III+ design, concurrently maintainable, 99.99% uptime SLA |
| Power per rack | 2N feeds, up to 8 kW standard, up to 16 kW on request |
| Cooling | N+1 CRAC, hot-aisle containment, 23°C +/- 2°C |
| Connectivity | 50+ carriers, direct France-IX, our AS35661 on-net |
| Cross-connect | 1G/10G/100G fiber or copper, installed within 24 hours |
| Space options | Quarter rack (10U), half rack (21U), full rack (42U), private cage |
| Remote hands | 24/7 on-site NOC, standard tasks within 2 hours |
| Delivery | 5 to 7 business days for a rack, 14 to 21 days for a cage |
Use Cases
- Primary production hosting
- Run your production racks on 2N power and N+1 cooling with a 99.99% uptime SLA. Dual feeds per rack keep the load up through a maintenance window.
- Carrier-neutral network node
- Land your own transit and cross-connect to 50+ carriers and France-IX from one rack. Our AS35661 is on-net for BGP and IP transit without leaving the building.
- Disaster recovery site
- Hold a secondary datacenter footprint in Paris with sub-15 ms latency to London, Frankfurt and Amsterdam. Quarter rack to cage, scale the space as the DR plan grows.
Service level
Every rack ships with a 99.99% uptime SLA, 2N power and N+1 cooling, 24/7 on-site NOC and remote hands. Biometric access, CCTV and VESDA detection run around the clock. One support contact, engineers only.
- Uptime SLA
- 99.99%
- Power
- 2N
- Support
- 24/7 NOC
Frequently Asked Questions
Colocation datacenter pricing depends on the footprint: rack count, power draw per rack, cross-connects, IP transit and contract term (12 to 36 months initial, then automatic 12-month renewals). Tell us the space and power you need and we return a firm quote within one business day. No obligation.
A quarter to full rack is ready in 5 to 7 business days. A private cage takes 14 to 21 days for buildout and security configuration. Delivery starts once the contract and access list are signed.
Tier III means concurrently maintainable: every power and cooling path has redundancy, so any component can be serviced without dropping your load. That backs the 99.99% uptime SLA, roughly 52 minutes of downtime per year.
Yes. The facility is carrier-neutral, so you cross-connect to any of 50+ carriers and to France-IX. You can also run BGP and IP transit on our AS35661 on-net, or bring your own RIPE-registered prefixes.
Ready to deploy in Paris?
Send us your rack count and power draw. We return an itemized colocation quote within one business day. No obligation.